Drainage Upgrade

Our team supported the upgrade of a major drainage project in South Australia. The works involved the installation of new stormwater assets designed to improve long-term resilience.

Scope of works included:

  • Excavation, installation and backfill of 93m of 3m box culvert.

  • Installation of 76m of 750mm RCP and 24m of 600mm RCP.

  • Excavation and installation of 6 ‘Double’ side entry pits.

  • Excavation and installation of 7 junction pits.

Despite the challenges of timing works during the holiday period, the project was delivered on schedule and within budget—ensuring improved stormwater management for the community.